Colonial Terminals – Weather Advisory

Tuesday, October 2, 2024

6:14 AM

Please be advised of terminal status changes below:

  • Foundation 1 (7 Foundation Drive) – Power has been restored and facility assessment underway for operational capability.
  • Foundation 2 (509 Foundation Drive - GKT) – Power has been restored and all operations have resumed.
  • Wahlstrom West (2 Wahlstrom Road) – All operations are down due to new power outage, with no expected duration for the outage.
  • Wahlstrom East (Woodcock Road) – All operations are down due to new power outage, with no expected duration for the outage.