Foundation 2
Dry Bulk Operation
Import Export Domestic 24/7 - 365 Operation
Silos Available for Bulk Export
Available Transportation Modes
- Vessel
- Truck
- Class 1 Rail Direct
Terminal Area
- ±90 acres (36 hectares)
- Acreage Available for Expansion
Total Storage Capacity
- 200,000 st (181,437 mt) Covered
Storage Facilities
- 26 Concrete Storage Silos
- Total Capacity – 85,800 st (77,838 mt)
- Flat Storage
- 5 Warehouses Totaling over 420,000 ft² (39,020 m³)
Terminal Trucking Operation
- Receiving and Loading Facilities
- Container
- Dry Van
- Flatbed
- Close to Georgia Ports Authority
Terminal Rail Operation
- Terminal Operated Switching Services
- Tracks – 24,000 ft (7,315 m)
- 250 Railcar Storage
- 4 Rail Car Receiving Systems
- Unit Train Capable
- Direct Transfer from Rail to Vessel
- 2 Automatic Positioners for Rail Car Unloading
- Rail Access to Warehouses and Covered Storage
Products
- Cement
- Kaolin (Bulk and Bag)
- Grains
- Wood Products
- Coal
- Starch
- Meals
- Paper
Equipment
- Modern Material Handling System
- Continuous Vessel Loading – 1,100 st/hour (1,000 mt/hour)
- Vessel Receiving Hoppers and Grabs
- Fork Lifts
- State-of-the-Art Bagging Operation
- Siwertell Vessel Unloader